ENDEAVOUR HILLS STAR JOURNAL
Home » Manufacturers hold up their petition

Manufacturers hold up their petition

Anxious Dandenong manufacturers on Progress Street are putting on hold a petition against the removal of the level crossing following a meeting with Dandenong MP Gabrielle Williams.

But despite the meeting with Ms Williams and South East Melbourne Manufacturers Alliance (SEMMA), manufacturers are still not convinced their pleas are being heard.

Managing Director of Pakaflex, Andrew Hamer said: “The only question I have is whether we are fobbed off again.

“Basically I’m giving it a couple of weeks to see what progresses out of the meeting and Gabrielle and LXRP come to address our issues. I’ve agreed to put the petition on hold for two weeks and to go with the Opposition if I have to for the petition.”

A road bridge is proposed by Level Crossing Removal Project (LXRP), which will connect Progress Street and Fowler Road in the busy industrial precinct.

According to the LXRP, the new design creates safer access for businesses to Princes Highway via an upgraded, signalised intersection at South Gippsland Highway.

Access across the rail line at Progress Street would be closed permanently.

Businesses in the area hold safety and health concerns about the design.

The precinct is home to manufacturers such as Vulcan, Pakaflex, Simmonds Lumber Group, JDN Monocrane and also Australia Post.

They stressed in the meeting with Ms Williams that this is an all-or-nothing option.

“So when the crossing is closed and we’re diverted down Fowler Road, there’s no other option. That’s what I was hitting Gabrielle with. What if I’m right and this is a lousy solution what can you do then?

Dead silence,” Mr Hamer said.

However, according to him, Ms Williams seemed genuine and interested in the Dandenong Bypass extension alternative but said: “Words are easy, actions are difficult”.

“I think politically she’s not prepared to put people between Hallam and Dandenong on buses.

“I don’t think she wants to do that. Politically the crossing has to close for her,” Mr Hamer said.

The group hold on to some hope with the Dandenong Bypass extension alternative while LXRP conducts further research on traffic studies after the meeting.

“That was very exciting because basically if we get access directly to Dandenong Bypass that’s a good outcome – I can’t argue with that one.”

According to him, this option can be politically viable for the parties, however, the timeframe to achieve this is drawn out, meaning fear of going down the restricted Fowler Road still looms over their heads.

Ms Williams said,“We’ll continue engaging and working with the local community, including local businesses, to ensure the project delivers the best outcomes for those who travel in the area as this project progresses.”

SEMMA was contacted for comment.

Digital Editions


  • EPA, Veolia at odds over toxic-waste cell

    EPA, Veolia at odds over toxic-waste cell

    Purchase this photo from Pic Store: 228738 The state’s pollution watchdog says it remains opposed to a new toxic-waste cell at a controversial hazardous-waste landfill…

More News

  • Minister’s warm welcome to Wellsprings

    Minister’s warm welcome to Wellsprings

    Purchase this photo from Pic Store: 532816 Wellsprings for Women welcomed the Federal Minister for Multicultural Affairs, Dr Anne Aly, who saw first hand the South East-based centre’s efforts to…

  • Food for thought ahead of bigger Ramadan Night Market

    Food for thought ahead of bigger Ramadan Night Market

    Purchase this photo from Pic Store: 467847 Excitement grows ahead of the upcoming three-week Ramadan Night Market that promises to be bigger and better, but existing traders in Dandenong have…

  • Two men arrested after Wallace Road assault

    Two men arrested after Wallace Road assault

    Two men have been arrested following an assault in Cranbourne on the morning of Friday 6 February. Officers responded to reports of three men involved in a physical altercation on…

  • Opposition inquiry call rejected after peak-hour train disruption

    Opposition inquiry call rejected after peak-hour train disruption

    Purchase this photo from Pic Store: 183562 The State Opposition has called for a formal inquiry into Tuesday 3 February rail network disruption, where peak-hour disruption left thousands of Cranbourne…

  • Roadworks cause havoc for Casey commuters

    Roadworks cause havoc for Casey commuters

    Roadworks on a major Clyde North intersection has caused gridlock during peak hours for many Casey commuters, some saying that their usual 10 minute drive has taken them close to…

  • Looking Back

    Looking Back

    100 years ago 11 February 1926 The new “Keep to the Left Rule”, which the Dandenong Shire Council has not brought into force, is not very strictly observed in the…

  • What’s On

    What’s On

    Purchase this photo from Pic Store: 390730 Victorian Mosque Open Day Mosques open their doors to visitors on this annual open day organised by Islamic Council of Victoria. Venues include…

  • The power of self-acceptance

    The power of self-acceptance

    Intrinsic in feelings of hope is the acceptance of the self and then the acceptance of the situation with the faith that there is some benefit in it. This attitude…

  • Jail for armed carjacker targeting elderly driver

    Jail for armed carjacker targeting elderly driver

    A would-be carjacker who held a screwdriver to his elderly victim’s neck and threatened to kill him in a home driveway in Keysborough has been jailed. Petap Kong, 31, of…

  • Letter-to-the-editor: Who will grow the trees?

    Letter-to-the-editor: Who will grow the trees?

    Purchase this photo from Pic Store: 492338 This summer’s repeated 40-degree days have made one thing unavoidable: Melbourne’s suburbs are heating up, and trees are no longer decorative extras. Councils…