ENDEAVOUR HILLS STAR JOURNAL
Home » 70 years in the making, Alstom factory keeps on rolling

70 years in the making, Alstom factory keeps on rolling

Father-and-son workers Richard and Mark Scholten have been part of many generations of Dandenong-produced trams and trains.

They took centre stage as employer Alstom celebrated 70 years of its rolling stock factory on Frankston-Dandenong Road on Friday 22 November.

In that time, the site’s built more than 600 trams and 800 trains for Victoria – many still in service, some for export.

The iconic fleets include the Comeng trains, Z, A, B and E Class trams, ‘Blue’ Harris train carriages and the V-Line VLocity trains.

The Scholtens have spanned much of the 70-year history on the factory floor.

“I’m very happy to work here where my father worked,” Mark says.

“We worked on many different projects over many, many years, and I’m very proud I can follow in my dad’s footsteps to say I’ve built Victoria’s transport system.”

Richard started at the site in the 1980s, with Mark joining as a teenager doing odd jobs.

After becoming an apprentice fitter, Mark joined his father at Dandenong working as a boilermaker on the Endeavour and Explorer project for NSW in 1994.

Mark was back at the factory in 2002 as one of two people hired to prepare the site for the VLocity rail project.

Since then, he’s been part of fitting and repairing Victorian rail infrastructure.

With more than 500 staff, the factory still plays an active role in all three of Victoria’s major rolling-stock projects.

These are building 100 Next Generation G Class trams, 25 X’Trapolis 2.0 metro trains and 124 VLocity trains.

The latter project has been ongoing since 2003, with some original team members still on the project.

Richard says the manufacturing still happening at Alstom was all the more important due to the loss of heavy industry in Victoria and Dandenong.

“It’s very important we get the tradespeople and businesses back where they should be,” he says.

His son says the community should be proud of the Dandenong-built fleets.

“To build VLocity trains here locally where the customer is very happy with the safety, the performance and the maintenance of the vehicle is next to none when it comes to local manufacturing.”

Alstom’s national managing director Pascal Dupond said “Victoria is the home of rail manufacturing in Australia, and Alstom’s Dandenong site is central to this legacy”.

“Our contribution to Victoria’s public transport network is made possible by the skills, expertise, and dedication of our team in Australia.

“We are proud to continue this deep partnership with the State to deliver world-class trams and trains.”

Digital Editions


More News

  • Waste-to-energy submissions open

    Waste-to-energy submissions open

    Public submissions have opened for the upcoming Victorian Parliamentary inquiry into the state’s push for waste-to-energy plants. South-Eastern Metropolitan MP Rachel Payne, who pushed for the inquiry, says there are…

  • Ambulance response times improve in Casey, state targets still unmet

    Ambulance response times improve in Casey, state targets still unmet

    Purchase this photo from Pic Store: 515650 New insights from Ambulance Victoria (AV) shows minor improvements in response times from first responders and turnaround durations in Casey, with an average…

  • $80,000 for Casey-wide Pest Management Strategy

    $80,000 for Casey-wide Pest Management Strategy

    Purchase this photo from Pic Store: 496313 Casey Council has unanimously endorsed a plan to set aside $80,000 to develop a municipality-wide Pest Animal Management Strategy, as growing rabbit infestations…

  • Clyde North safety breaches lead to $700k fine

    Clyde North safety breaches lead to $700k fine

    Purchase this photo from Pic Store: 166670 Construction works in Clyde North have been in the spotlight after roofing company Proform Roofing (Vic) Pty Ltd was fined $700,000 over multiple…

  • $250m Cranbourne South Hindu temple referral pulled for redesign

    $250m Cranbourne South Hindu temple referral pulled for redesign

    Plans for a proposed $250 million Hindu temple precinct in Cranbourne South’s green wedge have been put on hold after the applicant withdrew its Federal environmental referral, citing a redesign…

  • Hampton Park waste plan hits home

    Hampton Park waste plan hits home

    Purchase this photo from Pic Store: 470334 Residents are still seeking answers over an advanced-waste plan that’s extending the life of waste facilities near Hampton Park homes, says Casey Residents…

  • Casey Pushes statewide green streets expansion through MAV

    Casey Pushes statewide green streets expansion through MAV

    As part of the City of Casey’s membership with the Municipal Association of Victoria (MAV), the council will be calling on a Green Streets initiative at the State Council meetings…

  • Women Making It Work marks 20 years with book launch

    Women Making It Work marks 20 years with book launch

    Women Making It Work (WMIW), a grassroots network supporting women in business across Casey and Cardinia, marked its 20th anniversary with the launch of a new book sharing the personal…

  • Looking Back

    Looking Back

    100 years ago 25 February 1926 Out of his class At the Dandenong Court, Samuel Carrick was charged with travelling on the railways between Dandenong and Tooradin in the first-class…

  • Shine light in the darkness

    Shine light in the darkness

    May light shine through the darkness for each of us this year. As I reflect on the many meanings of light, I find that there are many positive meanings that…