ENDEAVOUR HILLS STAR JOURNAL
Home » Dandenong underpass two years ahead of schedule

Dandenong underpass two years ahead of schedule

A Dandenong level crossing removal project will be brought forward two years ahead of schedule, with final designs revealed.

The Webster Street boom gates will be removed in late 2025, replaced with a new rail bridge and a nearby road underpass connecting Princes Highway-Lonsdale Street to Cheltenham and Hammond roads.

As part of the design, traffic will be diverted from the Dandenong CBD and heavy vehicles off Webster Street.

Works will soon start on the underpass, which will tunnel through the Mamara supermarket site on the corner of Thomas and Lonsdale streets.

After engineering assessments, the new rail bridge structure will be built before excavating the underpass, the State Government announced.

This means the road was now slated to open in 2026 – two years ahead of schedule.

An alliance of John Holland Group, Kellogg Brown and Root, Metro Trains Melbourne and the Level Crossing Removal Project will build the new underpass and remove the level crossing.

The project also includes a new pedestrian and cycling underpass beneath the existing Dandenong Creek rail bridge connecting to the Dandenong Creek Trail.

A signalised intersection will be built at Princes Highway-Lonsdale Street.

According to the Government, the Webster Street level crossing is one of the most dangerous in Melbourne, with 22 near misses recorded since 2012.

Boom gates are down for 62 minutes during the morning peak, causing traffic congestion in central Dandenong.

Removing eight level crossings in the Greater Dandenong area will save around six hours of boom gate down time each morning, the Government states.

It will also coincide with the opening of the Metro Tunnel project, allowing more services to run on the Cranbourne and Pakenham lines.

Transport Infrastructure Minister Danny Pearson said the Government was removing every level crossing on the Cranbourne and Pakenham lines, improving traffic flows and safety on South East roads.

“The Webster Street level crossings will be the last to go on the Pakenham Line, and this project, together with the Metro Tunnel, will change the way people live, work and travel,”

Dandenong MP Gabrielle Williams said the new east-west road connection would help to take trucks out of the Dandenong CBD.

Digital Editions


More News

  • Looking Back

    Looking Back

    Purchase this photo from Pic Store: 223727 100 years ago 14 January 1926 WASHING DAY USEFUL HINTS One of the first worries that confront a newly-married couple is the laundry…

  • South east gets creative with NGV tour

    South east gets creative with NGV tour

    A series of free hands-on-art-making programs are coming to the south east as part of the NGV Kids on Tour. Holiday fun for children and families have doubled through this…

  • Springvale man won $1 million birthday prize

    Springvale man won $1 million birthday prize

    A Springvale South man has celebrated his birthday in unforgettable style, ticking off a major bucket list dream and unwrapping a marvellous $1 million prize in last night’s Weekday Windfall…

  • Sudan-born man charged over 42 alleged migration and bail offences

    Sudan-born man charged over 42 alleged migration and bail offences

    A Sudan-born man was expected to face Melbourne Magistrates’ Court after being charged with more than 42 alleged migration and bail offences. The AFP charged the man, 32, after locating…

  • Springvale seniors set to fundraise for Monash Children’s Hospital

    Springvale seniors set to fundraise for Monash Children’s Hospital

    The Springvale Italian Senior Citizens Club is set to fundraise for the Monash Children’s Hospital this year. As part of their annual October fundraising event, the hospital is chosen to…