ENDEAVOUR HILLS STAR JOURNAL
Home » Popular push for Doveton kids’ pool

Popular push for Doveton kids’ pool

A 2100-strong petition is pushing for a kids’ shallow pool and other children’s water facilities to be reinstated at Casey Council’s revamped Doveton Pool in the Park.

Doveton Eumemmerring Township Association’s online petition was tabled at a council meeting on 15 June, railing against the council’s preferred water-free stage-2 design.

Councillors unanimously voted for the petition to be considered by Casey’s chief executive Glenn Patterson.

Last year, the council fully funded the $7.92 million stage-1 of the project to rebuild the 50-metre pool and splash pad and shut down the waterslides and toddler pools.

In a recent public survey, the council pitched a largely hydrophobic stage-2 including a district-level playground, “kick-about grass” areas, sand/water play, nature play, picnic facilities and toilets.

DETA chair Joshua Oostwoud was disappointed that a kids’ pool, upgraded splash pad and waterslides were not even listed as options.

The pool would be less attractive to families, as a result, he says.

“The kids’ (water) options need to be present to make the pool a viable option.”

Mr Ooostwoud says the petition with more than 2000 signatures shows overwhelming local support for the cause.

It carries weight, as does having Doveton resident and former DETA chair Stefan Koomen as mayor, he says.

“The feedback is he’s very supportive and wants to respect the community’s wishes.”

In 2021, DETA’s ‘Save Doveton Pool’ campaign forced Casey to reverse plans to shut down the 50-metre and childrens pools and retain the area as parkland only.

Mayor Koomen has personally campaigned to regain kids aqua facilities including a shallow pool at Doveton.

He says the presented stage-2 options had been based on a masterplan backed by Casey’s former administrators.

But the public’s “strong voice” would be “taken on board”, he said.

“(The community consultation) will come back to Council, as well as the petition that the community has done will be considered in the report by Council.

“We want to make sure that the upgrades will be of benefit to the community for the next five decades.

“We want to make sure that it’s a sustainable and family-friendly facility.”

In the recent Casey 2025=’26 budget, $9.8 million was committed to the project.

The Federal Government has pitched in $7.5 million for stage-2.

Digital Editions


  • EPA, Veolia at odds over toxic-waste cell

    EPA, Veolia at odds over toxic-waste cell

    Purchase this photo from Pic Store: 228738 The state’s pollution watchdog says it remains opposed to a new toxic-waste cell at a controversial hazardous-waste landfill…

More News

  • Minister’s warm welcome to Wellsprings

    Minister’s warm welcome to Wellsprings

    Purchase this photo from Pic Store: 532816 Wellsprings for Women welcomed the Federal Minister for Multicultural Affairs, Dr Anne Aly, who saw first hand the South East-based centre’s efforts to…

  • Food for thought ahead of bigger Ramadan Night Market

    Food for thought ahead of bigger Ramadan Night Market

    Purchase this photo from Pic Store: 467847 Excitement grows ahead of the upcoming three-week Ramadan Night Market that promises to be bigger and better, but existing traders in Dandenong have…

  • Two men arrested after Wallace Road assault

    Two men arrested after Wallace Road assault

    Two men have been arrested following an assault in Cranbourne on the morning of Friday 6 February. Officers responded to reports of three men involved in a physical altercation on…

  • Opposition inquiry call rejected after peak-hour train disruption

    Opposition inquiry call rejected after peak-hour train disruption

    Purchase this photo from Pic Store: 183562 The State Opposition has called for a formal inquiry into Tuesday 3 February rail network disruption, where peak-hour disruption left thousands of Cranbourne…

  • Roadworks cause havoc for Casey commuters

    Roadworks cause havoc for Casey commuters

    Roadworks on a major Clyde North intersection has caused gridlock during peak hours for many Casey commuters, some saying that their usual 10 minute drive has taken them close to…

  • Looking Back

    Looking Back

    100 years ago 11 February 1926 The new “Keep to the Left Rule”, which the Dandenong Shire Council has not brought into force, is not very strictly observed in the…

  • What’s On

    What’s On

    Purchase this photo from Pic Store: 390730 Victorian Mosque Open Day Mosques open their doors to visitors on this annual open day organised by Islamic Council of Victoria. Venues include…

  • The power of self-acceptance

    The power of self-acceptance

    Intrinsic in feelings of hope is the acceptance of the self and then the acceptance of the situation with the faith that there is some benefit in it. This attitude…

  • Jail for armed carjacker targeting elderly driver

    Jail for armed carjacker targeting elderly driver

    A would-be carjacker who held a screwdriver to his elderly victim’s neck and threatened to kill him in a home driveway in Keysborough has been jailed. Petap Kong, 31, of…

  • Letter-to-the-editor: Who will grow the trees?

    Letter-to-the-editor: Who will grow the trees?

    Purchase this photo from Pic Store: 492338 This summer’s repeated 40-degree days have made one thing unavoidable: Melbourne’s suburbs are heating up, and trees are no longer decorative extras. Councils…